Step by step increasing...
A primary feature of the new station is the ability to compensate for adverse effects of snow and ice accumulation by means of hydraulic elevation of the building, without leaving parts of the construction to be swallowed by snow. This satisfies one of the major requirements of the environmental protection protocol. In addition, this construction design is the only technical solution to the complex challenges posed by drifting shelf ice with high accumulation rates of snow.
The overall weight of 2,300 tonnes is distributed onto 16 foundation slabs. To compensate for the snow accumulation, the station will be raised at regular intervals by means of hydraulic jacks.
Lifting of Neumayer Station III
The process of lifting by means of hydraulic jacks.
(copyright Alfred Wegener Institute, .avi 2,8MB).